QUALITY ASSURANCE PLAN-LSAW
APPLICABLE SPEC. API 5L 44TH EDITION (2007)
FORMAT NO. ALLLAND1301
PROJECT MYANMAR PROJECT
MANUFACTURING PROCESS LONGITUDINAL SEAM SUB MERGED ARC WELDING
Related terms are defined as follow:
HOL

The relevant inspectors shall be informed of time and location of

testing and witnessing is required for each unit. All activities are

to be held until the control or test has been completed satisfactorily.Witnessing is mandatory the cycle and written notice through a

registered check advice at least 2 week in advance for special

inspection or important stages and 24 hours in advance for regular

inspection. TPI shall sign and seal the reports. The relevant

inspectors shall be informed of time an location of testing through

a registered check advice or other kind of official letter which shall be

submitted to related parties at least 2 week in advance for special

inspection or important stages and 24 hours in advance for regular inspection.

However, work may proceed without the presence of the inspector discretion.

TPI shall sign and seal the reports.

Monitor

Work proceeds without the presence and special information of the test.

Inspectors reserve the right to attend this activity at any time.

Check of certifications and /or documents, with approved procedures,specification and acceptance criteria.

Review Documents reviewed by TPI, shall be signed and sealed as reviewed.
RA Review and Approval
SW

Spot Witness point. However, work may proceed without the presence

of the inspector discretion.

Perform Mill performs.
C COMPANY(SIPC)
STSS STSS

KD

CONTRACTOR (Purchaser)
Vendor Litonglian Co